Process

Step 01

01

Planning / Design

image-process-01-1

The main purpose of using 3D software in the designing is to be able to accurately define each detailed part of the vessel in order to avoid mistakes such as inconsistency of adjacent parts and difficulty in production process.

Step 02

02

number

Steel Processing

Steel Processing

The construction of a hull involves complex works equipped with advance technologies. (Shot Blasting, NC Cutting, Heat Bending)

Step 03

03

number

Hull Fabrication

Hull Fabrication

The shaped steel plates are then passed to the fabrication shops where they are assembled into units and parts the fabricated as hull block.

Step 04

04

number

Pre-Outfitting

Pre Outfitting

Outfitting techniques are used to produce more complex units already equipped with pipes and other fittings.

Step 05

05

number

Hull Erection

Hull Erection

Prefabricated blocks are transferred to the building berth to form the hull of the ship. Transfer may be made by crane or special vehicle (e.g. Kamag block carrier). Portable automatic electric arc welding machines and manual electric arc welding are then used to assemble the units.

Step 06

06

number

Accommodation Loading

Accommodation

The whole Accommodation of the ship has five storeys and each is fabricated separately with its interior. Then, it will be loaded into the vessel by a floating crane before launching.

Step 07

07

number

Launching

Launching

At an appropriate stage, normally after the completion of the hull and superstructure and the installation of some of the parts and machinery, the ship will be launched. Christening is often conducted during the Launching or during Delivery.

Step 08

08

number

Hull Outfitting

Hull Outfitting

After the launching, the ship enters the outfitting phase. This is the time when there is a great deal of activity installing and protecting a considerable amount of parts and equipment.

Step 09

09

number

Sea Trial

Sea Trial

Before the ship will be delivered to its owner, it must undergo sea trial during which shipyard workers go onboard to engage testing of all parts of the ship to ensure that everything is satisfactorily operational.

Step 10

10

number

Delivery

Delivery

After a ceremony at the bridge of the ship, with the entire owner’s excellent assessment, the ship will sail out from her maiden voyage going to its homeport. Delivered ships are guaranteed of its superior performance and quality.

Step 01

01

1

Planning / Design

image-process-01-1

The main purpose of using 3D software in the designing is to be able to accurately define each detailed part of the vessel in order to avoid mistakes such as inconsistency of adjacent parts and difficulty in production process.

Step 02

02

2

Steel Processing

Steel Processing

The construction of a hull involves complex works equipped with advance technologies. (Shot Blasting, NC Cutting, Heat Bending)

Step 03

03

3

Hull Fabrication

Hull Fabrication

The shaped steel plates are then passed to the fabrication shops where they are assembled into units and parts the fabricated as hull block.

Step 04

04

4

Pre-Outfitting

Pre Outfitting

Outfitting techniques are used to produce more complex units already equipped with pipes and other fittings.

Step 05

05

5

Hull Erection

Hull Erection

Prefabricated blocks are transferred to the building berth to form the hull of the ship. Transfer may be made by crane or special vehicle (e.g. Kamag block carrier). Portable automatic electric arc welding machines and manual electric arc welding are then used to assemble the units.

Step 06

06

6

Accommodation Loading

Accommodation

The whole Accommodation of the ship has five storeys and each is fabricated separately with its interior. Then, it will be loaded into the vessel by a floating crane before launching.

Step 07

07

7

Launching

Launching

At an appropriate stage, normally after the completion of the hull and superstructure and the installation of some of the parts and machinery, the ship will be launched. Christening is often conducted during the Launching or during Delivery.

Step 08

08

08

Hull Outfitting

Hull Outfitting

After the launching, the ship enters the outfitting phase. This is the time when there is a great deal of activity installing and protecting a considerable amount of parts and equipment.

Step 09

09

9

Sea Trial

Sea Trial

Before the ship will be delivered to its owner, it must undergo sea trial during which shipyard workers go onboard to engage testing of all parts of the ship to ensure that everything is satisfactorily operational.

Step 10

10

10

Delivery

Delivery

After a ceremony at the bridge of the ship, with the entire owner’s excellent assessment, the ship will sail out from her maiden voyage going to its homeport. Delivered ships are guaranteed of its superior performance and quality.